Annexes to COM(2022)549 - Proposal for a COUNCIL REGULATION Enhancing solidarity through better coordination of gas purchases, exchanges of gas across borders and reliable price benchmarks

Please note

This page contains a limited version of this dossier in the EU Monitor.

ANNEX I

(a)Maximum critical gas volumes for electricity security of supply pursuant to Article 23 for the period between December 2022 to March 2023 (values in million cubic metres) (1):

Member StateDecember 2022January 2023February 2023March 2023
AT74,24196,83152,20139,35
BE399,05458,77382,76398,99
BG61,4971,2661,5563,29
CY----
CZ17,2649,6434,8028,28
DE2 090,532 419,562 090,591 863,77
DK249,48295,56254,87268,09
EE5,895,785,001,05
EL209,95326,68317,18232,80
ES1 378,231 985,661 597,271 189,29
IE372,76375,29364,26375,74
FI28,4239,5544,6612,97
FR876,37875,58802,53771,15
HR10,9566,0159,9948,85
HU82,13133,97126,4493,72
IT2 166,463 304,993 110,792 774,67
LV89,2683,5684,9666,19
LT16,1320,2218,814,21
LU----
MT32,8834,8431,4333,02
NL684,26762,31556,26480,31
PL158,14158,64136,97148,64
PT409,97415,22368,54401,32
RO130,35179,35162,41159,71
SI12,9815,1513,3512,80
SK33,9947,2634,8034,76
SE18,0518,6117,7115,76

(b)Maximum critical gas volumes for electricity security of supply pursuant to Article 23 for the period between April 2023 to December 2023 (values in million cubic metres):

Member StateMonthly value
AT140,66
BE409,89
BG64,40
CY-
CZ32,50
DE2 116,11
DK267,00
EE4,43
EL271,65
ES1 537,61
IE372,01
FI31,40
FR831,41
HR46,45
HU109,06
IT2 839,23
LV80,99
LT14,84
LU-
MT33,03
NL620,79
PL150,60
PT398,76
RO157,96
SI13,57
SK37,70
SE17,53



(1) The figures in Annex I, parts (a) and (b), are based on data from the winter adequacy assessment pursuant to Article 9 of Regulation (EU) 2019/941 by the European Network of Transmission System Operators for Electricity (ENTSO-E), except for Malta for which the electricity generation relies exclusively on LNG deliveries with no significant storage capacities. Given the specificity of the low-calorific gas, the values for the Netherlands in this table should be multiplied with a conversion factor of 37,89 divided by 35,17. Annex I, part (a), represents the individual monthly volumes calculated by ENTSO-E for the months December 2022 to March 2023; the figures in Annex I, part (b), for the months April 2023 to December 2023 represent the average of the values in the period between December 2022 and March 2023.



ANNEX II

Security of supply critical infrastructure pursuant to Article 23(2), point (d)

SectorSubsector
I Energy
1.Electricity
Infrastructures and facilities for generation and transmission of electricity in respect of supply electricity
2.Oil
Oil production, refining, treatment, storage and transmission by pipelines
3.Gas
Gas production, refining, treatment, storage and transmission by pipelines

LNG terminals
II Transport
4.Road transport
5.Rail transport
6.Air transport