Legal provisions of COM(2011)810 - Participation and dissemination in 'Horizon 2020 – the Framework Programme for Research and Innovation (2014-2020)' - Main contents
Please note
This page contains a limited version of this dossier in the EU Monitor.
dossier | COM(2011)810 - Participation and dissemination in 'Horizon 2020 – the Framework Programme for Research and Innovation (2014-2020)'. |
---|---|
document | COM(2011)810 |
date | December 11, 2013 |
Contents
- TITLE I - INTRODUCTORY PROVISIONS
- Article 1 - Subject matter and scope
- Article 2 - Definitions
- Article 3 - Confidentiality
- Article 4 - Information to be made available
- Article 5 - Guidance and information for potential participants
- TITLE II - RULES FOR PARTICIPATION
- CHAPTER I - General provisions
- Article 6 - Forms of funding
- Article 7 - Legal entities that may participate in actions
- Article 8 - Independence
- CHAPTER II - Grants
- Section I - Award procedure
- Article 9 - Conditions for participation
- Article 10 - Eligibility for funding
- Article 11 - Calls for proposals
- Article 12 - Joint calls with third countries or with international organisations
- Article 13 - Proposals
- Article 14 - Ethics review
- Article 15 - Selection and award criteria
- Article 16 - Evaluation review procedure
- Article 17 - Enquiries and complaints
- Article 18 - Grant agreement
- Article 19 - Grant decisions
- Article 20 - Time to grant
- Article 21 - Time to Pay
- Article 22 - Secure electronic system
- Section II - Implementation
- Article 23 - Implementation of actions
- Article 24 - Consortium
- Section III - Forms of grants and funding rules
- Article 25 - Forms of grants
- Article 26 - Eligibility of costs
- Article 27 - Direct eligible personnel costs
- Article 28 - Funding of the action
- Article 29 - Indirect costs
- Article 30 - Evaluation of the funding levels
- Article 31 - Annual productive hours
- Article 32 - Owners of SMEs and natural persons without a salary
- Article 33 - Unit costs
- Article 34 - Certificate on the financial statements
- Article 35 - Certificate on the methodology
- Article 36 - Certifying auditors
- Article 37 - Cumulative funding
- Section IV - Guarantees
- Article 38 - Participant Guarantee Fund
- Article 39 - Operation of the Fund
- CHAPTER III - Experts
- Article 40 - Appointment of independent experts
- TITLE III - RULES GOVERNING THE EXPLOITATION AND DISSEMINATION OF RESULTS
- CHAPTER I - Grants
- Section I - Results
- Article 41 - Ownership of results
- Article 42 - Protection of results
- Article 43 - Exploitation and dissemination of results
- Article 44 - Transfer and licensing of results
- Section II - Access rights to background and results
- Article 45 - Background
- Article 46 - Access rights principles
- Article 47 - Access rights for implementation
- Article 48 - Access rights for exploitation
- Article 49 - Access rights for the Union and the Member States
- TITLE IV - SPECIFIC PROVISIONS
- Article 50 - Prizes
- Article 51 - Procurement, pre-commercial procurement and public procurement of innovative solutions
- Article 52 - Financial Instruments
- Article 53 - SME Instrument
- Article 54 - Fast Track to Innovation
- Article 55 - Other specific provisions
- TITLE V - FINAL PROVISIONS
- Article 56 - Exercise of the delegation
- Article 57 - Repeal and transitional provisions
- Article 58
TITLE I - INTRODUCTORY PROVISIONS
Article 1 - Subject matter and scope
This Regulation also lays down the rules governing the exploitation and dissemination of results.
2. Subject to the specific rules laid down in this Regulation, the relevant rules of Regulation (EU, Euratom) No 966/2012 and Regulation (EU) No 1268/2012 shall apply.
3. Regulation (EC) No 294/2008 or any basic act which entrusts budget implementation tasks to a funding body under Article 185 TFEU may establish rules which depart from those laid down in this Regulation. In order to take into account their specific operating needs and subject to the rules established in the relevant basic act, the Commission shall be empowered to adopt delegated acts in accordance with Article 56, with regard to funding bodies set up under Article 187 TFEU concerning:
(a) | the conditions for participation in calls for proposals issued by funding bodies established in the area of aeronautics with a view to reducing the minimum number of participants set out in Article 9(1); |
(b) | the eligibility for funding as set out in Article 10, allowing funding bodies established in the area of bio-based industries and of innovative medicines to limit the eligibility for funding to specific types of participants; |
(c) | the rules governing exploitation and dissemination of results, allowing funding bodies established in the area of innovative medicines to:
|
(d) | the funding of the actions, allowing funding bodies in the area of electronic components and systems to apply reimbursement rates different to those set out in Article 28(3) in cases where one or more Member States co-fund a participant or an action. A funding body entrusted with budget implementation tasks under points (i) or (ii) of point (c) of Article 58(1) of Regulation (EU, Euratom) No 966/2012, may apply rules which depart from those laid down in this Regulation, subject to the consent of the Commission, if its specific operating needs so require. The Commission shall give its consent in such cases only if those rules are in compliance with the general principles established in this Regulation. |
4. This Regulation shall not apply to direct actions carried out by the Joint Research Centre (JRC).
Article 2 - Definitions
(1) | 'access rights' means rights to use results or background under the terms and conditions laid down in accordance with this Regulation; |
(2) | 'affiliated entity' means any legal entity that is under the direct or indirect control of a participant, or under the same direct or indirect control as the participant, or that is directly or indirectly controlling a participant. Control may take any of the forms set out in Article 8(2); |
(3) | 'associated country' means a third country which is party to an international agreement with the Union, as identified in Article 7 of Regulation (EU) No 1291/2013; |
(4) | 'background' means any data, know-how or information whatever its form or nature, tangible or intangible, including any rights such as intellectual property rights, which is: (i) held by participants prior to their accession to the action; (ii) needed for carrying out the action or for exploiting the results of the action; and (iii) identified by the participants in accordance with Article 45; |
(5) | 'basic act' means a legal act adopted by the Union institutions in the form of a regulation, a directive or a decision within the meaning of Article 288 TFEU which provides a legal basis for the action; |
(6) | 'innovation action' means an action primarily consisting of activities directly aimed at producing plans and arrangements or designs for new, altered or improved products, processes or services. For this purpose they may include prototyping, testing, demonstrating, piloting, large-scale product validation and market replication; |
(7) | 'coordination and support action' means an action consisting primarily of accompanying measures such as standardisation, dissemination, awareness-raising and communication, networking, coordination or support services, policy dialogues and mutual learning exercises and studies, including design studies for new infrastructure, and may also include complementary activities of networking and coordination between programmes in different countries; |
(8) | 'dissemination' means the public disclosure of the results by any appropriate means (other than resulting from protecting or exploiting the results), including by scientific publications in any medium; |
(9) | 'exploitation' means the use of results in further research activities other than those covered by the action concerned, or in developing, creating and marketing a product or process, or in creating and providing a service, or in standardisation activities; |
(10) | 'fair and reasonable conditions' means appropriate conditions, including possible financial terms or royalty-free conditions, taking into account the specific circumstances of the request for access, for example the actual or potential value of the results or background to which access is requested and/or the scope, duration or other characteristics of the exploitation envisaged; |
(11) | 'funding body' means a body or authority, other than the Commission, as referred to in point (c) of Article 58(1) of Regulation (EU, Euratom) No 966/2012, to which the Commission has entrusted budget implementation tasks in accordance with Article 9(2) of Regulation (EU) No 1291/2013; |
(12) | 'international European interest organisation' means an international organisation, the majority of whose members are Member States or associated countries, and whose principal objective is to promote scientific and technological cooperation in Europe; |
(13) | 'legal entity' means any natural person, or any legal person created and recognised as such under national law, Union law or international law, which has legal personality and which may, acting in its own name, exercise rights and be subject to obligations; |
(14) | 'non-profit legal entity' means a legal entity which by its legal form is non-profit-making or which has a legal or statutory obligation not to distribute profits to its shareholders or individual members; |
(15) | 'participant' means any legal entity carrying out an action or part of an action under Regulation (EU) No 1291/2013 having rights and obligations with regard to the Union or another funding body under this Regulation; |
(16) | 'programme co-fund action' means an action funded through a grant the main purpose of which is supplementing individual calls or programmes funded by entities, other than Union funding bodies, managing research and innovation programmes. A programme co-fund action may also include complementary activities of networking and coordination between programmes in different countries; |
(17) | 'pre-commercial procurement' means the procurement of research and development services involving risk-benefit sharing under market conditions, and competitive development in phases, where there is a clear separation of the research and development services procured from the deployment of commercial volumes of end-products; |
(18) | 'public procurement of innovative solutions' means procurement where contracting authorities act as a launch customer for innovative goods or services which are not yet available on a large-scale commercial basis, and may include conformity testing; |
(19) | 'results' means any tangible or intangible output of the action, such as data, knowledge or information, that is generated in the action, whatever its form or nature, whether or not it can be protected, as well as any rights attached to it, including intellectual property rights; |
(20) | 'SME' means micro-, small- and medium-sized enterprises, as defined in Commission Recommendation 2003/361/EC (22); |
(21) | 'work programme' means the document adopted by the Commission for the implementation of the specific programme in accordance with Article 5 of Council Decision 2013/743/EU of 3 December 2013 (23); |
(22) | 'work plan' means the document similar to the Commission work programme adopted by funding bodies entrusted with part of the implementation of Horizon 2020 in accordance with Article 9(2) of Regulation (EU) No 1291/2013. |
2. For the purposes of this Regulation, an entity which does not have legal personality under the applicable national law shall be considered as being assimilated to a legal entity provided that the conditions set out in Article 131(2) of Regulation (EU, Euratom) No 966/2012 and Article 198 of Regulation (EU) No 1268/2012 are complied with.
3. For the purposes of this Regulation, grant recipients shall not be considered to be funding bodies.
Article 3 - Confidentiality
Article 4 - Information to be made available
(a) | the information concerned is relevant to public policy; |
(b) | the participants have not provided sound and sufficient reasons for withholding the information concerned. |
In actions under the specific objective Secure societies - Protecting freedom and security of Europe and its citizens, the Commission shall upon request make available to Union institutions, bodies, offices or agencies or to Member States' national authorities any useful information in its possession concerning results generated by a participant in an action that has received Union funding. The Commission shall notify the participant of such communication. Where a Member State or Union institution, body, office or agency requests the communication of information, the Commission shall also notify such communication to all Member States.
2. The provision of information pursuant to paragraph 1 shall not be deemed to transfer to the recipient any rights or obligations of the Commission or of the participants. However, the recipient shall treat any such information as confidential unless it becomes public or is made available publicly by the participants, or unless it was communicated to the Commission without restrictions concerning confidentiality. The Commission rules on security shall apply regarding classified information.
Article 5 - Guidance and information for potential participants
TITLE II - RULES FOR PARTICIPATION
CHAPTER I - General provisions
Article 6 - Forms of funding
Article 7 - Legal entities that may participate in actions
2. The relevant work programme may restrict the participation in Horizon 2020 or parts thereof of legal entities established in third countries where conditions for the participation of legal entities from Member States, or of their affiliated entities established in a third country, in the third country's research and innovation programmes are considered to be prejudicial to the Union's interests.
3. The relevant work programme or work plan may exclude entities unable to provide satisfactory security guarantees, including as regards personnel security clearance if justified by security reasons.
4. The JRC may participate in actions with the same rights and obligations as a legal entity established in a Member State.
Article 8 - Independence
2. For the purposes of paragraph 1, control may, in particular, take either of the following forms:
(a) | the direct or indirect holding of more than 50 % of the nominal value of the issued share capital in the legal entity concerned, or of a majority of the voting rights of the shareholders or associates of that entity; |
(b) | the direct or indirect holding, in fact or in law, of decision-making powers in the legal entity concerned. |
3. For the purposes of paragraph 1, the following relationships between legal entities shall not in themselves be deemed to constitute controlling relationships:
(a) | the same public investment corporation, institutional investor or venture-capital company has a direct or indirect holding of more than 50 % of the nominal value of the issued share capital or a majority of voting rights of the shareholders or associates; |
(b) | the legal entities concerned are owned or supervised by the same public body. |
CHAPTER II - Grants
Section I - Award procedure
Article 9 - Conditions for participation
(a) | at least three legal entities shall participate in an action; |
(b) | three legal entities shall each be established in a different Member State or associated country; and |
(c) | the three legal entities referred to in point (b) shall be independent of each other within the meaning of Article 8. |
2. For the purposes of paragraph 1, where one of the participants is the JRC, or an international European interest organisation or an entity created under Union law, it shall be deemed to be established in a Member State or associated country other than any Member State or associated country in which another participant in the same action is established.
3. By way of derogation from paragraph 1, the minimum condition shall be the participation of one legal entity established in a Member State or associated country, in the case of:
(a) | European Research Council (ERC) frontier research actions; |
(b) | the SME instrument, where the action has a clear European added value; |
(c) | programme co-fund actions; and |
(d) | justified cases provided for in the work programme or work plan. |
4. By way of derogation from paragraph 1, in the case of coordination and support actions and training and mobility actions, the minimum condition shall be the participation of one legal entity.
5. Where appropriate and duly justified, work programmes or work plans may provide for additional conditions according to specific policy requirements or to the nature and objectives of the action, including inter alia conditions regarding the number of participants, the type of participant and the place of establishment.
Article 10 - Eligibility for funding
(a) | any legal entity established in a Member State or associated country, or created under Union law; |
(b) | any international European interest organisation; |
(c) | any legal entity established in a third country identified in the work programme. |
2. In the case of a participating international organisation or in the case of a participating legal entity established in a third country, neither of which are eligible for funding according to paragraph 1, funding from the Union may be granted provided that at least one of the following conditions is fulfilled:
(a) | the participation is deemed essential for carrying out the action by the Commission or the relevant funding body; |
(b) | such funding is provided for under a bilateral scientific and technological agreement or any other arrangement between the Union and the international organisation or, for entities established in third countries, the country in which the legal entity is established. |
Article 11 - Calls for proposals
2. As an exception and without prejudice to the other cases provided for in Regulation (EU, Euratom) No 966/2012 and Regulation (EU) No 1268/2012, calls for proposals shall not be issued for coordination and support actions and programme co-fund actions to be carried out by legal entities identified in the work programmes or work plans provided that the action does not fall within the scope of a call for proposals.
3. In accordance with the relevant rules of Regulation (EU, Euratom) No 966/2012 and Regulation (EU) No 1268/2012, sufficient time periods for preparing proposals shall be provided, with reasonable notice of upcoming calls for proposals through the publication of a work programme and a reasonable time period between the publication of a call for proposals and the deadline for submitting a proposal.
Article 12 - Joint calls with third countries or with international organisations
2. Legal entities receiving funding from the Union shall conclude a grant agreement with the Union or the relevant funding body. That grant agreement shall include a description of the work to be done by those participants and by the participating legal entities from the third countries involved.
3. Legal entities receiving funding from the Union shall conclude a coordination agreement with the participating legal entities receiving funding from the relevant third countries or international organisations.
Article 13 - Proposals
2. Any proposal for research on human embryonic stem cells shall include, as appropriate, details of licensing and control measures that will be taken by the competent authorities of the Member States concerned as well as details of the ethical approvals that will be provided. As regards the derivation of human embryonic stem cells, institutions, organisations and researchers shall be subject to strict licensing and control in accordance with the legal framework of the Member States concerned.
3. A proposal which contravenes ethical principles or any applicable legislation, or which does not fulfil the conditions set out in Decision No 2013/743/EU, in the work programme, in the work plan or in the call for proposals may be excluded from the evaluation, selection and award procedures at any time.
4. Where relevant and specified in the work programme or the work plan, proposals shall explain how and to what extent gender analysis is relevant to the content of the intended project.
Article 14 - Ethics review
2. The Commission shall make the process of the ethics review as transparent as possible and ensure that it is carried out in a timely manner avoiding, where possible, the resubmission of documents.
Article 15 - Selection and award criteria
(a) | excellence; |
(b) | impact; |
(c) | quality and efficiency of the implementation. |
2. Only the criterion referred to in point (a) of paragraph 1 shall apply to proposals for ERC frontier research actions.
3. The criterion referred to in point (b) of paragraph 1 may be given a higher weighting for proposals for innovation actions.
4. The work programme or work plan shall lay down further details of the application of the award criteria laid down in paragraph 1, and specify weightings and thresholds.
5. The Commission shall take into account the possibility of a two-stage submission procedure provided for in Regulation (EU, Euratom) No 966/2012 and Regulation (EU) No 1268/2012, where appropriate and consistent with the objectives of the call for proposals.
6. Proposals shall be ranked according to the evaluation results. The selection shall be made on the basis of that ranking.
7. The evaluation shall be carried out by independent experts.
8. In the case of a legal entity referred to in Article 11(2) or in other duly justified exceptional circumstances, the evaluation may be carried out in a manner derogating from paragraph 7. In each case of such evaluation the Commission shall provide the Member States with detailed information on the evaluation procedure used and its outcome.
9. In cases where the requested funding from the Union for the action is equal or superior to EUR 500 000, the Commission or the relevant funding body shall, by means compatible with national law, verify in advance the financial capacity of only the coordinators. Furthermore, whenever there are grounds to doubt the financial capacity of the coordinator or other participants on the basis of available information, the Commission or the relevant funding body shall verify their financial capacity.
10. The financial capacity shall not be verified either in respect of legal entities whose viability is guaranteed by a Member State or an associated country or in respect of higher and secondary education establishments.
11. Financial capacity may be guaranteed by any other legal entity, whose financial capacity shall in turn be verified in accordance with paragraph 9.
Article 16 - Evaluation review procedure
2. A request for review shall relate to a specific proposal, and shall be submitted by the coordinator of the proposal within 30 days of the date on which the Commission or the relevant funding body informs the coordinator of the evaluation results.
3. The Commission or the relevant funding body shall be responsible for the examination of the request referred to in paragraph 2. The examination shall cover only the procedural aspects of the evaluation, and not the merits of the proposal.
4. An evaluation review committee composed of Commission staff or of staff of the relevant funding body shall provide an opinion on the procedural aspects of the evaluation process. It shall be chaired by an official of the Commission or of the relevant funding body, from a department other than that responsible for the call for proposals. The committee may recommend one of the following:
(a) | re-evaluation of the proposal primarily by evaluators not involved in the previous evaluation; |
(b) | confirmation of the initial evaluation. |
5. On the basis of the recommendation referred to in paragraph 4, a decision shall be taken by the Commission or the relevant funding body and notified to the coordinator of the proposal. The Commission or the relevant funding body shall take such decision without undue delay.
6. The review procedure shall not delay the selection process of proposals which are not the subject of requests for review.
7. The review procedure shall not preclude any other actions the participant may take in accordance with Union law.
Article 17 - Enquiries and complaints
2. The Commission shall ensure that information on how to register concerns, enquiries or complaints is made available to all participants and is published on-line.
Article 18 - Grant agreement
2. The Commission or the relevant funding body shall enter into a grant agreement with the participants. The removal or substitution of an entity before signature of the grant agreement shall be duly justified.
3. The grant agreement shall establish the rights and obligations of the participants and of either the Commission or the relevant funding body in compliance with this Regulation. It shall also establish the rights and obligations of legal entities which become participants during the implementation of the action, as well as the role and tasks of a consortium coordinator.
4. On the basis of a requirement in a work programme or work plan, the grant agreement may establish rights and obligations of the participants with regard to access rights, exploitation and dissemination, in addition to those laid down in this Regulation.
5. The grant agreement shall, where appropriate and to the extent possible, reflect the general principles laid down in the Commission Recommendation on the European Charter for Researchers and the Code of Conduct for the Recruitment of Researchers, principles of research integrity, the Commission Recommendation on the management of intellectual property in knowledge transfer activities, the Code of Practice for universities and other public research institutions as well as the gender equality principle laid down in Article 16 of Regulation (EU) No 1291/2013.
6. The grant agreement shall, where appropriate, contain provisions ensuring the respect of ethical principles, including the establishment of an independent ethics board and the right of the Commission to carry out an ethics audit by independent experts.
7. In duly justified cases, specific grants for actions may form part of a framework partnership in accordance with Regulation (EU, Euratom) No 966/2012 and Regulation (EU) No 1268/2012.
Article 19 - Grant decisions
Article 20 - Time to grant
2. The dates referred to in paragraph 1 shall be based on the following periods:
(a) | for informing all applicants of the outcome of the scientific evaluation of their application, a maximum period of five months from the final date for submission of complete proposals; |
(b) | for signing grant agreements with applicants or notifying grant decisions to them, a maximum period of three months from the date of informing applicants they have been successful. |
3. The periods referred to in paragraph 2 may be exceeded for actions of the ERC and in exceptional, duly justified cases, in particular where actions are complex, where there is a large number of proposals or where requested by the applicants.
4. Participants shall be given reasonable time to submit the information and documentation required for the signature of the grant agreement. The Commission shall make decisions and requests for information as promptly as possible. Where possible, resubmission of documents shall be avoided.
Article 21 - Time to Pay
Article 22 - Secure electronic system
Section II - Implementation
Article 23 - Implementation of actions
2. Participants shall make no commitments which are incompatible with this Regulation or the grant agreement. Where a participant fails to comply with its obligations regarding the technical implementation of the action, the other participants shall comply with the obligations without any additional Union funding unless the Commission or the relevant funding body expressly relieves them of that obligation. In the event of a participant defaulting, the Commission may, in accordance with point (a) of Article 39(3) transfer the amount due from the Participant Guarantee Fund referred to in Article 38 to the coordinator of the action. The financial responsibility of each participant shall be limited to its own debt subject to the provisions relating to the Participant Guarantee Fund. Participants shall ensure that the Commission or the relevant funding body is informed in due time of any event which might significantly affect the implementation of the action or the interests of the Union.
3. Participants shall implement the action and shall take all necessary and reasonable measures to that end. They shall have the appropriate resources as and when needed for carrying out the action. Where it is necessary for the implementation of the action, they may call upon third parties, including subcontractors, to carry out work under the action or may use resources made available by third parties by means of contributions in kind, according to the conditions set out in the grant agreement. Participants shall retain responsibility towards the Commission or the relevant funding body and towards the other participants for the work carried out.
4. The award of subcontracts for carrying out certain elements of the action shall be limited to the cases provided for in the grant agreement and to duly justified cases that could not be clearly foreseen at the time of entry into force of the grant agreement.
5. Third parties other than subcontractors may carry out work under the action under the conditions laid down in the grant agreement. The third party and the work to be carried out by it shall be identified in the grant agreement.
Costs incurred by those third parties may be deemed eligible if the third party meets all the following conditions:
(a) | it would be eligible for funding if it were a participant; |
(b) | it is an affiliated entity or has a legal link to a participant implying a collaboration not limited to the action; |
(c) | it is identified in the grant agreement; |
(d) | it abides by the rules applicable to the participant under the grant agreement with regard to eligibility of costs and control of expenditure; |
(e) | it accepts joint and several liability with the participant for the Union contribution corresponding to the amount declared by the third party, if required by the Commission or the relevant funding body. |
6. Third parties may also make available resources to a participant by means of contributions in kind to the action. Costs incurred by third parties in relation to such contributions which are made free of charge are eligible for funding provided they meet the conditions established in the grant agreement.
7. The action may involve financial support to third parties under the conditions established in Regulation (EU, Euratom) No 966/2012 and Regulation (EU) No 1268/2012. The amounts referred to in point (c) of Article 137(1) of Regulation (EU, Euratom) No 966/2012 may be exceeded where it is necessary to achieve the objectives of an action.
8. The action carried out by participants which are contracting authorities within the meaning of Directive 2004/17/EC of the European Parliament and of the Council (24), Directive 2004/18/EC of the European Parliament and of the Council (25) and Directive 2009/81/EC of the European Parliament and of the Council (26) may involve or have as their primary aim the pre-commercial procurement and procurement of innovative solutions, where provided for in a work programme or a work plan and required for its implementation. In such cases, the rules set out in Article 51(2), (4) and (5) of this Regulation shall apply to the procurement procedures carried out by the participants.
9. Participants shall comply with national legislation, regulations and ethical rules in the countries where the action will be carried out. Where appropriate, participants shall seek the approval of the relevant national or local ethics committees prior to the start of the action.
10. Work using animals shall be carried out in accordance with Article 13 TFEU and shall comply with the requirement to replace, reduce and refine the use of animals for scientific purposes in accordance with Union law and in particular with Directive 2010/63/EU of the European Parliament and of the Council (27).
Article 24 - Consortium
2. The members of a consortium participating in an action shall conclude an internal agreement ("the consortium agreement") establishing their rights and obligations with respect to the implementation of the action in compliance with the grant agreement, except in duly justified cases provided for in the work programme or work plan or call for proposals. The Commission shall publish guidelines on the main issues that may be addressed by participants in the consortium agreement.
3. The consortium agreement may stipulate inter alia the following:
(a) | the internal organisation of the consortium; |
(b) | the distribution of the Union funding; |
(c) | rules on dissemination, use and access rights, additional to those in Title III, Chapter I of this Regulation, and to the provisions in the grant agreement; |
(d) | arrangements for settling internal disputes; |
(e) | liability, indemnification and confidentiality arrangements between the participants. |
The members of the consortium may make any arrangements in the consortium they deem fit to the extent that those arrangements are not in conflict with the grant agreement or this Regulation.
4. The consortium may propose to add or remove a participant or change the coordinator in accordance with the relevant provisions of the grant agreement, provided that the change is in conformity with the conditions for participation, does not adversely affect the implementation of the action and is not contrary to the principle of equal treatment.
Section III - Forms of grants and funding rules
Article 25 - Forms of grants
Article 26 - Eligibility of costs
2. Ineligible costs are those not complying with the conditions of paragraph 1, including, in particular, provisions for possible future losses or charges, exchange losses, costs related to return on capital, costs reimbursed in respect of another Union action or programme, debt and debt service charges and excessive or reckless expenditure.
Article 27 - Direct eligible personnel costs
2. Without prejudice to the conditions laid down in Article 26, additional remuneration to personnel of participants that are non-profit legal entities assigned to the action, including payments on the basis of supplementary contracts regardless of their nature, may also be considered as direct eligible personnel costs, up to the amount set out in paragraph 3, if they fulfil the following additional conditions:
(a) | it is part of the usual remuneration practices of the participant and is paid in a consistent manner whenever the same kind of work or expertise is required; |
(b) | the criteria used to calculate the supplementary payments are objective and of general application by the participant, independent of the source of funding used. |
3. Additional remuneration may be eligible up to EUR 8 000 per year and per person. In relation to a person not working exclusively for the action, a limit per hour shall apply. The limit per hour shall be calculated by dividing EUR 8 000 by the number of annual productive hours calculated in accordance with Article 31.
Article 28 - Funding of the action
2. The following shall be considered as receipts of the action:
(a) | resources made available by third parties to the participants by means of financial transfers or contributions in kind free of charge, the value of which has been declared as eligible costs by the participant, provided that they have been contributed by the third party specifically to be used in the action; |
(b) | income generated by the action, except income generated by the exploitation of the results of the action; |
(c) | income generated from the sale of assets purchased under the grant agreement up to the value of the cost initially charged to the action by the participant. |
3. A single reimbursement rate of the eligible costs shall be applied per action for all activities funded therein. The maximum rate shall be fixed in the work programme or work plan.
4. The Horizon 2020 grant may reach a maximum of 100 % of the total eligible costs, without prejudice to the co-financing principle.
5. The Horizon 2020 grant shall be limited to a maximum of 70 % of the total eligible costs for innovation actions and programme co-fund actions.
By way of derogation from paragraph 3, the Horizon 2020 grant may, for innovation actions, reach a maximum of 100 % of the total eligible costs for non-profit legal entities, without prejudice to the co-financing principle.
6. The reimbursement rates determined in this Article shall also apply in the case of actions where flat rate, unit or lump-sum financing is fixed for the whole or part of the action.
Article 29 - Indirect costs
2. By way of derogation from paragraph 1, indirect costs may be declared in the form of a lump sum or unit costs when provided for in the work programme or work plan.
Article 30 - Evaluation of the funding levels
Article 31 - Annual productive hours
2. For persons working exclusively for the action, no time recording is required. In such cases, the participant shall sign a declaration confirming that the person concerned has worked exclusively for the action.
3. The grant agreement shall contain:
(a) | the minimum requirements for the time recording system; |
(b) | the option to choose between a fixed number of annual productive hours and the method for establishing the number of annual productive hours to be used for the calculation of the hourly personnel rates, taking account of the participant's usual accounting practices. |
Article 32 - Owners of SMEs and natural persons without a salary
Article 33 - Unit costs
(a) | statistical data or similar objective means; |
(b) | auditable historical data of the participant. |
2. Direct eligible personnel costs may be financed on the basis of unit costs determined according to the participant's usual cost accounting practices, provided that they comply with the following cumulative criteria:
(a) | they are calculated on the basis of the total actual personnel costs recorded in the participant's general accounts which may be adjusted by the participant on the basis of budgeted or estimated elements according to the conditions defined by the Commission; |
(b) | they comply with Articles 26 and 27; |
(c) | they ensure compliance with the non-profit requirement and the avoidance of double funding of costs; |
(d) | they are calculated with due regard to Article 31. |
Article 34 - Certificate on the financial statements
Article 35 - Certificate on the methodology
2. Where the Commission accepts a certificate on the methodology, it shall be valid for all actions financed under Regulation (EU) No 1291/2013 and the participant shall calculate and claim costs on the basis of it. Once the Commission has accepted a certificate on the methodology, it shall not attribute any systemic or recurrent error to the accepted methodology.
Article 36 - Certifying auditors
2. Upon request by the Commission, the Court of Auditors or the European Anti-fraud Office (OLAF), the auditor who delivers the certificate on the financial statements and on the methodology shall grant access to the supporting documents and audit working papers on the basis of which a certificate on the financial statements or on the methodology was issued.
Article 37 - Cumulative funding
Section IV - Guarantees
Article 38 - Participant Guarantee Fund
2. The Fund shall be operated in accordance with Article 39. Any financial interest generated by the Fund shall be added to the Fund and shall serve exclusively for the purposes set out in Article 39(3).
3. Where interest is insufficient to cover the operations described in Article 39(3), the Fund shall not intervene and the Commission or the relevant Union funding body shall recover directly from participants or third parties any amount owed.
4. The Fund shall be considered a sufficient guarantee under Regulation (EU, Euratom) No 966/2012. No additional guarantee or security may be accepted from participants or imposed upon them except in the case described in paragraph 3 of this Article.
5. Participants in actions under Horizon 2020 whose risk is covered by the Fund shall make a contribution of 5 % of the Union funding for the action. At the end of the action the amount contributed to the Fund shall be returned to the participants, via the coordinator.
6. The rate of the participants' contribution to the Fund set out in paragraph 5 may be reduced on the basis of the interim evaluation of Horizon 2020.
Article 39 - Operation of the Fund
The Commission may manage the Fund directly or entrust the financial management of the Fund either to the European Investment Bank or to an appropriate financial institution ("the depository bank"). The depository bank shall manage the Fund pursuant to the instructions of the Commission.
2. The participants' contribution to the Fund may be offset from the initial pre-financing and be paid to the Fund on behalf of the participants.
3. Where amounts are due to the Union by a participant, the Commission may, without prejudice to penalties which may be imposed on the defaulting participant, take either of the following actions:
(a) | transfer, or order the depository bank to transfer, directly the amount due from the Fund to the coordinator of the action. That transfer shall be made after the termination or withdrawal of the participation of the defaulting participant if the action is still ongoing and if the remaining participants agree to implement it according to the same objectives. Amounts transferred from the Fund shall be regarded as Union funding; |
(b) | recover effectively that amount from the Fund. |
The Commission shall issue a recovery order against that participant or third party to the benefit of the Fund. The Commission may adopt to that end a recovery decision in accordance with Regulation (EU, Euratom) No 966/2012.
4. The amounts recovered shall constitute revenue assigned to the Fund within the meaning of Article 21(4) of Regulation (EU, Euratom) No 966/2012. Once the implementation of all grants whose risk is covered by the Fund is complete, any sums outstanding shall be recovered by the Commission and entered into the budget of the Union, subject to decisions of the legislative authority.
CHAPTER III - Experts
Article 40 - Appointment of independent experts
(a) | the evaluation of proposals; |
(b) | the monitoring of the implementation of actions carried out under Regulation (EU) No 1291/2013 as well as of previous Research and/or Innovation Programmes; |
(c) | the implementation of Union research and innovation policy or programmes including Horizon 2020, as well as the achievement and functioning of the European Research Area; |
(d) | the evaluation of Research and Innovation Programmes; |
(e) | the design of the Union research and innovation policy, including the preparation of future programmes. |
2. Independent experts shall be chosen on the basis of their skills, experience and knowledge appropriate to carry out the tasks assigned to them. In cases where independent experts have to deal with classified information, the appropriate security clearance shall be required before appointment.
Independent experts shall be identified and selected on the basis of calls for applications from individuals and calls addressed to relevant organisations such as research agencies, research institutions, universities, standardisation organisations, civil society organisations or enterprises with a view to establishing a database of candidates.
The Commission or the relevant funding body may, if deemed appropriate and in duly justified cases, select in a transparent manner any individual expert with the appropriate skills not included in the database.
When appointing independent experts, the Commission or the relevant funding body shall take appropriate measures to seek a balanced composition within the expert groups and evaluation panels in terms of various skills, experience, knowledge, geographical diversity and gender, and taking into account the situation in the field of the action. Where appropriate, private-public sector balance shall also be sought.
The Commission or the relevant funding body may call upon the advice of advisory bodies for the appointment of independent experts. In the case of ERC frontier research actions, the Commission shall appoint experts on the basis of a proposal from the Scientific Council of the ERC.
3. The Commission or the relevant funding body shall ensure that an expert faced with a conflict of interest in relation to a matter on which the expert is required to provide an opinion does not evaluate, advise or assist on the specific matter in question.
4. All exchanges with independent experts, including the conclusion of contracts for their appointment and any amendment thereto, may be done through electronic exchange systems set up by the Commission or by the relevant funding body as stipulated in Article 287(4) of Regulation (EU) No. 1268/2012.
5. The names of experts appointed in a personal capacity, who have assisted the Commission or the funding bodies in implementation of Regulation (EU) No 1291/2013 and Decision 2013/743/EU shall be published, together with their area of expertise, at least once a year on the internet site of the Commission or the relevant funding body. Such information shall be collected, processed and published in accordance with Regulation (EC) No 45/2001.
TITLE III - RULES GOVERNING THE EXPLOITATION AND DISSEMINATION OF RESULTS
CHAPTER I - Grants
Section I - Results
Article 41 - Ownership of results
2. Where participants in an action have jointly generated results, and where their respective contribution to the joint results cannot be ascertained, or where it is not possible to separate such joint results for the purpose of applying for, obtaining or maintaining the relevant intellectual property rights protection, they shall have joint ownership of those results. The joint owners shall establish an agreement regarding the allocation and terms of exercise of that joint ownership in accordance with their obligations under the grant agreement. The joint owners may agree not to continue with joint ownership but decide on an alternative regime, inter alia by transferring their ownership shares to a single owner with access rights for the other participants, once the results have been generated.
Unless otherwise agreed in the joint ownership agreement, each joint owner shall be entitled to grant non-exclusive licences to third parties to exploit the jointly owned results, without any right to sub-license, subject to the following conditions:
(a) | prior notice shall be given to the other joint owners; |
(b) | fair and reasonable compensation shall be provided to the other joint owners. |
3. If employees or any party working for a participant are entitled to claim rights to the results generated, the participant concerned shall ensure that it is possible for those rights to be exercised in a manner compatible with its obligations under the grant agreement.
Article 42 - Protection of results
2. Where a participant that has received Union funding intends not to protect results generated by it for reasons other than impossibility under Union or national law or the lack of potential for commercial or industrial exploitation, and unless the participant intends to transfer them to another legal entity established in a Member State or associated country in view of their protection, it shall inform the Commission or the relevant funding body before any dissemination relating to those results takes place. The Commission, on behalf of the Union, or the relevant funding body may, with the consent of the participant concerned, assume ownership of those results and take the necessary steps for their adequate protection.
The participant may refuse consent only if it demonstrates that its legitimate interests would suffer significant harm. No dissemination relating to those results may take place until the Commission or the relevant funding body has taken a decision not to assume ownership of the results or has decided that it will assume ownership and has taken the necessary steps to ensure their protection. The Commission or the relevant funding body shall make such decision without undue delay. The grant agreement shall lay down time-limits in this respect.
3. Where a participant that has received Union funding intends to abandon the protection of results or intends not to seek the extension of such protection for reasons other than the lack of potential for commercial or industrial exploitation within a period that shall not exceed five years following the payment of the balance, it shall inform the Commission or the relevant funding body, which may continue or extend protection by assuming ownership thereof. The participant may refuse consent only if it demonstrates that its legitimate interests would suffer significant harm. The grant agreement shall lay down time-limits in this respect.
Article 43 - Exploitation and dissemination of results
Any additional exploitation obligations shall be laid down in the grant agreement. In the case of research with the potential to address major societal challenges, additional exploitation obligations may include licensing on non-exclusive terms. Any such additional obligations shall be indicated in the work programme or work plan.
2. Subject to any restrictions due to the protection of intellectual property, security rules or legitimate interests, each participant shall through appropriate means disseminate the results it owns as soon as possible. The grant agreement may lay down time-limits in this respect.
Any additional dissemination obligations shall be laid down in the grant agreement and indicated in the work programme or work plan.
With regard to the dissemination of results through scientific publications, open access shall apply under the terms and conditions laid down in the grant agreement. Costs relating to open access to scientific publications that result from research funded under Horizon 2020, incurred within the duration of an action, shall be eligible for reimbursement under the conditions of the grant agreement. With due regard to Article 18 of Regulation (EU) No 1291/2013, the grant agreement shall not stipulate conditions regarding open access to publications which would result in additional publishing costs after the completion of an action.
With regard to the dissemination of research data, the grant agreement may, in the context of the open access to and the preservation of research data, lay down terms and conditions under which open access to such results shall be provided, in particular in ERC frontier research and FET (Future and Emerging Technologies) research or in other appropriate areas, and taking into consideration the legitimate interests of the participants and any constraints pertaining to data protection rules, security rules or intellectual property rights. In such cases, the work programme or work plan shall indicate if the dissemination of research data through open access is required.
Prior notice of any dissemination activity shall be given to the other participants. Following notification, a participant may object if it demonstrates that its legitimate interests in relation to its results or background would suffer significant harm by the intended dissemination. In such cases, the dissemination may not take place unless appropriate steps are taken to safeguard those legitimate interests. The grant agreement shall lay down time-limits in this respect.
3. For the purposes of monitoring and dissemination by the Commission or the relevant funding body, participants shall provide any information on their exploitation and dissemination related activities, and provide any documents necessary in accordance with the conditions laid down in the grant agreement. Subject to the legitimate interests of the participants which have provided the information, such information shall be made publicly available. The grant agreement shall, inter alia, lay down time-limits with respect to such reporting obligations.
4. All patent applications, standards, publications or any other dissemination, including those in electronic form, relating to results shall, if possible, include a statement, which may include visual means, that the action received financial support from the Union. The terms of that statement shall be established in the grant agreement.
Article 44 - Transfer and licensing of results
Without prejudice to confidentiality obligations arising from laws or regulations in the case of mergers and acquisitions, where other participants still enjoy access rights or may still request the granting of access rights to the results to be transferred, a participant which intends to transfer the results shall give prior notice to the other participants, together with sufficient information concerning the intended new owner of the results, to permit the other participants to analyse the effect of the intended transfer on the possible exercise of their access rights.
Following notification, a participant may object to the transfer of ownership if it demonstrates that the intended transfer would adversely affect the exercise of its access rights. In such a case, the transfer may not take place until agreement has been reached between the participants concerned. The grant agreement shall lay down time-limits in this respect.
The other participants may by prior written agreement waive their right to prior notice and to object to transfers of ownership from one participant to a specifically identified third party.
2. Provided that access rights to the results can be exercised, and that any additional exploitation obligations are complied with by the participant which owns the results, the latter may grant licences or otherwise grant the right to exploit them to any legal entity, including on an exclusive basis. Exclusive licences for results may be granted subject to consent by all the other participants concerned that they will waive their access rights thereto.
3. With regard to results which are generated by participants that have received Union funding, the grant agreement may provide that the Commission or the relevant funding body may object to transfers of ownership or to grants of an exclusive licence to third parties established in a third country not associated with Horizon 2020, if it considers that the grant or transfer is not in accordance with the interests of developing the competitiveness of the Union economy, or is inconsistent with ethical principles or security considerations.
In such cases, the transfer of ownership or grant of exclusive licence shall not take place unless the Commission or the relevant funding body is satisfied that appropriate safeguards will be put in place.
Where appropriate, the grant agreement shall provide that the Commission or the relevant funding body is to be notified in advance of any such transfer of ownership or grant of an exclusive licence. The grant agreement shall lay down time-limits in this respect.
Section II - Access rights to background and results
Article 45 - Background
Article 46 - Access rights principles
2. Unless otherwise agreed by the owner of the results or background to which access is requested, access rights shall not include the right to sub-license.
3. Participants in the same action shall inform each other before their accession to the grant agreement of any legal restriction or limit to granting access to their background. Any agreement concluded thereafter by a participant regarding background shall ensure that any access rights may be exercised.
4. The termination of the participation in an action shall not affect the obligation of such a participant to grant access under the terms and conditions established in the grant agreement.
5. The consortium agreement may stipulate that where a participant defaults on its obligations and such default is not remedied, such a defaulting participant shall no longer enjoy access rights.
Article 47 - Access rights for implementation
Such access shall be granted on a royalty-free basis.
2. A participant shall enjoy access rights to background of another participant in the same action if this background is needed by the former to carry out its work under the action, and subject to any restrictions or limits pursuant to Article 46(3).
Such access shall be granted on a royalty-free basis, unless otherwise agreed by the participants before their accession to the grant agreement.
Article 48 - Access rights for exploitation
Subject to agreement, such access shall be granted under fair and reasonable conditions.
2. A participant shall enjoy access rights to background of another participant in the same action if this background is needed by the former to exploit its own results, and subject to any restrictions or limits pursuant to Article 46(3).
Subject to agreement, such access shall be granted under fair and reasonable conditions.
3. An affiliated entity established in a Member State or associated country shall, unless otherwise provided for in the consortium agreement, also have access rights to results and, subject to any restrictions or limits pursuant to Article 46(3), to background under fair and reasonable conditions if those results and background are needed to exploit the results generated by the participant to which it is affiliated. Such access rights shall be requested and obtained directly from the participant owning the results or background unless otherwise agreed in accordance with Article 46(2).
4. A request for access under paragraphs 1, 2 or 3 may be made up to one year after the end of the action, unless the participants agree on a different time-limit.
Article 49 - Access rights for the Union and the Member States
Such access shall be granted on a royalty-free basis.
2. Regarding actions under the specific objective Secure societies - Protecting freedom and security of Europe and its citizens set out in Part III of Annex I to Regulation (EU) No 1291/2013, Union institutions, bodies, offices and agencies, as well as Member States' national authorities, shall, for the purpose of developing, implementing and monitoring their policies or programmes in this area, enjoy the necessary access rights to the results of a participant that has received Union funding. Such access rights shall be limited to non-commercial and non-competitive use. Such access rights shall be granted on a royalty-free basis and upon bilateral agreement defining specific conditions aimed at ensuring that those rights will be used only for the intended purpose and that appropriate confidentiality obligations will be in place. Such access rights shall not extend to the participant's background. The requesting Member State, Union institution, body, office or agency shall notify all Member States of such requests. The Commission rules on security shall apply regarding classified information.
TITLE IV - SPECIFIC PROVISIONS
Article 50 - Prizes
2. Any prize awarded shall be conditional upon the acceptance of the appropriate publicity obligations. Regarding the dissemination of results, Title III of this Regulation shall apply. The work programme or work plan may contain specific obligations regarding exploitation and dissemination.
Article 51 - Procurement, pre-commercial procurement and public procurement of innovative solutions
2. Union funding may take the form of pre-commercial procurement or the procurement of innovative solutions carried out by the Commission or the relevant funding body on its own behalf or jointly with contracting authorities from Member States and associated countries.
The procurement procedures:
(a) | shall comply with the principles of transparency, non-discrimination, equal treatment, sound financial management, proportionality, with competition rules and, where applicable, with Directives 2004/17/EC, 2004/18/EC and 2009/81/EC, or, where the Commission acts on its own behalf, with Regulation (EU, Euratom) No 966/2012; |
(b) | may provide for specific conditions such as the place of performance of the procured activities being limited for pre-commercial procurement, to the territory of the Member States and of countries associated to Horizon 2020 where duly justified by the objectives of the actions; |
(c) | may authorise the award of multiple contracts within the same procedure (multiple sourcing); |
(d) | shall provide for the award of the contracts to the tender(s) offering best value for money. |
3. Unless otherwise stipulated in the call for tenders, results generated by procurement carried out by the Commission shall be owned by the Union.
4. Specific provisions regarding ownership, access rights and licensing shall be laid down in the contracts regarding pre-commercial procurement to ensure maximum uptake of the results and to avoid any unfair advantage. The contractor generating results in pre-commercial procurement shall own at least the attached intellectual property rights. The contracting authorities shall enjoy at least royalty-free access rights to the results for their own use and the right to grant, or require the participating contractors to grant, non-exclusive licences to third parties to exploit the results under fair and reasonable conditions without any right to sub-license. If a contractor fails to commercially exploit the results within a given period after the pre-commercial procurement as identified in the contract, it shall transfer any ownership of the results to the contracting authorities.
5. Specific provisions regarding ownership, access rights and licensing may be laid down in the contracts regarding public procurement of innovative solutions to ensure maximum uptake of the results and to avoid any unfair advantage.
Article 52 - Financial Instruments
2. By way of derogation from the second subparagraph of Article 140(6) of Regulation (EU, Euratom) No 966/2012, both revenues and annual repayments generated by a financial instrument established under Regulation (EU) No 1291/2013 shall be assigned, in accordance with Article 21(4) of Regulation No 966/2012, to that financial instrument.
3. By way of derogation from the second subparagraph of Article 140(6) of Regulation (EU, Euratom) No 966/2012, both revenues and annual repayments generated by the Risk Sharing Finance facility set up under Decision No 1982/2006/EC and the early stage part of the High-Growth and Innovative SME Facility (GIF1) set up under Decision No 1639/2006/EC, shall be assigned, in accordance with Article 21(4) of Regulation (EU, Euratom) No 966/2012, to the succeeding financial instruments under Regulation (EU) No 1291/2013.
Article 53 - SME Instrument
2. Once a company has been validated as an SME, that legal status shall be assumed to prevail for the entire duration of the project, even in cases where the company, due to its growth, later exceeds the ceilings of the SME definition.
3. In the case of the SME instrument or grants by funding bodies or by the Commission targeting SMEs, the grant agreement may lay down specific provisions, in particular on ownership, access rights, exploitation and dissemination.
Article 54 - Fast Track to Innovation
2. Proposals may be submitted at any time. The Commission shall set three cut-off dates per year to evaluate proposals. The period between a cut-off date and signature of the grant agreement or notification of the grant decision shall not exceed six months. Proposals shall be ranked according to the impact, quality and efficiency of implementation and excellence, with the criterion of impact given a higher weighting. No more than five legal entities shall participate in any one action. The amount of the grant shall not exceed EUR 3 million.
Article 55 - Other specific provisions
2. In the case of actions to support existing or new research infrastructures, the grant agreement may lay down specific provisions relating to users of the infrastructure and to the users' access to them.
3. In the case of ERC frontier research actions, the grant agreement may lay down specific provisions, in particular on access rights, portability and dissemination, or relating to participants, researchers and any party concerned by the action.
4. In the case of training and mobility actions, the grant agreement may lay down specific provisions on commitments relating to the researchers benefiting from the action, ownership, access rights and portability.
5. In the case of coordination and support actions, the grant agreement may lay down specific provisions, in particular on ownership, access rights, exploitation and dissemination of results.
6. In the case of the Knowledge and Innovation Communities of the EIT, the grant agreement may lay down specific provisions, in particular on ownership, access rights, exploitation and dissemination.
TITLE V - FINAL PROVISIONS
Article 56 - Exercise of the delegation
2. The power to adopt delegated acts referred to in Article 1(3) shall be conferred on the Commission for the duration of Horizon 2020.
3. The delegation of power referred to in Article 1(3) may be revoked at any time by the European Parliament or by the Council. A decision to revoke shall put an end to the delegation of the power specified in that decision. It shall take effect the day following the publication of the decision in the Official Journal of the European Union or at a later date specified therein. It shall not affect the validity of any delegated acts already in force.
4. As soon as it adopts a delegated act, the Commission shall notify it simultaneously to the European Parliament and to the Council.
5. A delegated act adopted pursuant to Article 1(3) shall enter into force only if no objection has been expressed either by the European Parliament or by the Council within a period of two months of notification of that act to the European Parliament and the Council or if, before the expiry of that period, the European Parliament and the Council have both informed the Commission that they will not object. That period shall be extended by two months at the initiative of the European Parliament or of the Council.
Article 57 - Repeal and transitional provisions
2. Without prejudice to paragraph 1, this Regulation shall not affect the continuation or modification, including the total or partial termination, of the actions concerned, until their closure, or until the award of financial assistance by the Commission or funding bodies under Decision No 1982/2006/EC or any other legislation applying to that assistance on 31 December 2013, which shall continue to apply to the actions concerned until their closure.
3. Any sums from the participant Guarantee Fund set up by Regulation (EC) No 1906/2006 as well as all its rights and obligations shall be transferred to the Fund as of 31 December 2013. The participants in actions under Decision No 1982/2006/EC signing grant agreements after 31 December 2013 shall make their contribution to the Fund.
Article 58
This Regulation shall be binding in its entirety and directly applicable in all Member States.