Legal provisions of COM(2006)195 - Amendment of Council Directives 89/665/EEC and 92/13/EEC CEE with regard to improving the effectiveness of review procedures concerning the award of public contracts - Main contents
Please note
This page contains a limited version of this dossier in the EU Monitor.
dossier | COM(2006)195 - Amendment of Council Directives 89/665/EEC and 92/13/EEC CEE with regard to improving the effectiveness of review procedures ... |
---|---|
document | COM(2006)195 |
date | December 11, 2007 |
Contents
Article 1 - Amendments to Directive 89/665/EEC
1. | Articles 1 and 2 shall be replaced by the following: ‘Article 1 Scope and availability of review procedures 1. This Directive applies to contracts referred to in Directive 2004/18/EC of the European Parliament and of the Council of 31 March 2004 on the coordination of procedures for the award of public works contracts, public supply contracts and public service contracts (10), unless such contracts are excluded in accordance with Articles 10 to 18 of that Directive. Contracts within the meaning of this Directive include public contracts, framework agreements, public works concessions and dynamic purchasing systems. Member States shall take the measures necessary to ensure that, as regards contracts falling within the scope of Directive 2004/18/EC, decisions taken by the contracting authorities may be reviewed effectively and, in particular, as rapidly as possible in accordance with the conditions set out in Articles 2 to 2f of this Directive, on the grounds that such decisions have infringed Community law in the field of public procurement or national rules transposing that law. 2. Member States shall ensure that there is no discrimination between undertakings claiming harm in the context of a procedure for the award of a contract as a result of the distinction made by this Directive between national rules implementing Community law and other national rules. 3. Member States shall ensure that the review procedures are available, under detailed rules which the Member States may establish, at least to any person having or having had an interest in obtaining a particular contract and who has been or risks being harmed by an alleged infringement. 4. Member States may require that the person wishing to use a review procedure has notified the contracting authority of the alleged infringement and of his intention to seek review, provided that this does not affect the standstill period in accordance with Article 2a(2) or any other time limits for applying for review in accordance with Article 2c. 5. Member States may require that the person concerned first seek review with the contracting authority. In that case, Member States shall ensure that the submission of such an application for review results in immediate suspension of the possibility to conclude the contract. Member States shall decide on the appropriate means of communication, including fax or electronic means, to be used for the application for review provided for in the first subparagraph. The suspension referred to in the first subparagraph shall not end before the expiry of a period of at least 10 calendar days with effect from the day following the date on which the contracting authority has sent a reply if fax or electronic means are used, or, if other means of communication are used, before the expiry of either at least 15 calendar days with effect from the day following the date on which the contracting authority has sent a reply, or at least 10 calendar days with effect from the day following the date of the receipt of a reply. Article 2 - Requirements for review procedures
2. The powers specified in paragraph 1 and Articles 2d and 2e may be conferred on separate bodies responsible for different aspects of the review procedure. 3. When a body of first instance, which is independent of the contracting authority, reviews a contract award decision, Member States shall ensure that the contracting authority cannot conclude the contract before the review body has made a decision on the application either for interim measures or for review. The suspension shall end no earlier than the expiry of the standstill period referred to in Article 2a(2) and Article 2d(4) and (5). 4. Except where provided for in paragraph 3 and Article 1(5), review procedures need not necessarily have an automatic suspensive effect on the contract award procedures to which they relate. 5. Member States may provide that the body responsible for review procedures may take into account the probable consequences of interim measures for all interests likely to be harmed, as well as the public interest, and may decide not to grant such measures when their negative consequences could exceed their benefits. A decision not to grant interim measures shall not prejudice any other claim of the person seeking such measures. 6. Member States may provide that where damages are claimed on the grounds that a decision was taken unlawfully, the contested decision must first be set aside by a body having the necessary powers. 7. Except where provided for in Articles 2d to 2f, the effects of the exercise of the powers referred to in paragraph 1 of this Article on a contract concluded subsequent to its award shall be determined by national law. Furthermore, except where a decision must be set aside prior to the award of damages, a Member State may provide that, after the conclusion of a contract in accordance with Article 1(5), paragraph 3 of this Article or Articles 2a to 2f, the powers of the body responsible for review procedures shall be limited to awarding damages to any person harmed by an infringement. 8. Member States shall ensure that decisions taken by bodies responsible for review procedures can be effectively enforced. 9. Where bodies responsible for review procedures are not judicial in character, written reasons for their decisions shall always be given. Furthermore, in such a case, provision must be made to guarantee procedures whereby any allegedly illegal measure taken by the review body or any alleged defect in the exercise of the powers conferred on it can be the subject of judicial review or review by another body which is a court or tribunal within the meaning of Article 234 of the Treaty and independent of both the contracting authority and the review body. The members of such an independent body shall be appointed and leave office under the same conditions as members of the judiciary as regards the authority responsible for their appointment, their period of office, and their removal. At least the President of this independent body shall have the same legal and professional qualifications as members of the judiciary. The independent body shall take its decisions following a procedure in which both sides are heard, and these decisions shall, by means determined by each Member State, be legally binding. |
2. | the following articles shall be inserted: ‘Article 2a Standstill period 1. The Member States shall ensure that the persons referred to in Article 1(3) have sufficient time for effective review of the contract award decisions taken by contracting authorities, by adopting the necessary provisions respecting the minimum conditions set out in paragraph 2 of this Article and in Article 2c. 2. A contract may not be concluded following the decision to award a contract falling within the scope of Directive 2004/18/EC before the expiry of a period of at least 10 calendar days with effect from the day following the date on which the contract award decision is sent to the tenderers and candidates concerned if fax or electronic means are used or, if other means of communication are used, before the expiry of a period of either at least 15 calendar days with effect from the day following the date on which the contract award decision is sent to the tenderers and candidates concerned or at least 10 calendar days with effect from the day following the date of the receipt of the contract award decision. Tenderers shall be deemed to be concerned if they have not yet been definitively excluded. An exclusion is definitive if it has been notified to the tenderers concerned and has either been considered lawful by an independent review body or can no longer be subject to a review procedure. Candidates shall be deemed to be concerned if the contracting authority has not made available information about the rejection of their application before the notification of the contract award decision to the tenderers concerned. The communication of the award decision to each tenderer and candidate concerned shall be accompanied by the following:
Article 2 - b Derogations from the standstill period Member States may provide that the periods referred to in Article 2a(2) of this Directive do not apply in the following cases:
If this derogation is invoked, Member States shall ensure that the contract is ineffective in accordance with Articles 2d and 2f of this Directive where:
Article 2 - c Time limits for applying for review Where a Member State provides that any application for review of a contracting authority's decision taken in the context of, or in relation to, a contract award procedure falling within the scope of Directive 2004/18/EC must be made before the expiry of a specified period, this period shall be at least 10 calendar days with effect from the day following the date on which the contracting authority's decision is sent to the tenderer or candidate if fax or electronic means are used or, if other means of communication are used, this period shall be either at least 15 calendar days with effect from the day following the date on which the contracting authority's decision is sent to the tenderer or candidate or at least 10 calendar days with effect from the day following the date of the receipt of the contracting authority's decision. The communication of the contracting authority's decision to each tenderer or candidate shall be accompanied by a summary of the relevant reasons. In the case of an application for review concerning decisions referred to in Article 2(1)(b) of this Directive that are not subject to a specific notification, the time period shall be at least 10 calendar days from the date of the publication of the decision concerned.Article 2 - d Ineffectiveness 1. Member States shall ensure that a contract is considered ineffective by a review body independent of the contracting authority or that its ineffectiveness is the result of a decision of such a review body in any of the following cases:
2. The consequences of a contract being considered ineffective shall be provided for by national law. National law may provide for the retroactive cancellation of all contractual obligations or limit the scope of the cancellation to those obligations which still have to be performed. In the latter case, Member States shall provide for the application of other penalties within the meaning of Article 2e(2). 3. Member States may provide that the review body independent of the contracting authority may not consider a contract ineffective, even though it has been awarded illegally on the grounds mentioned in paragraph 1, if the review body finds, after having examined all relevant aspects, that overriding reasons relating to a general interest require that the effects of the contract should be maintained. In this case, Member States shall provide for alternative penalties within the meaning of Article 2e(2), which shall be applied instead. Economic interests in the effectiveness of the contract may only be considered as overriding reasons if in exceptional circumstances ineffectiveness would lead to disproportionate consequences. However, economic interests directly linked to the contract concerned shall not constitute overriding reasons relating to a general interest. Economic interests directly linked to the contract include, inter alia, the costs resulting from the delay in the execution of the contract, the costs resulting from the launching of a new procurement procedure, the costs resulting from the change of the economic operator performing the contract and the costs of legal obligations resulting from the ineffectiveness. 4. The Member States shall provide that paragraph 1(a) of this Article does not apply where:
5. The Member States shall provide that paragraph 1(c) of this Article does not apply where:
Article 2 - e Infringements of this Directive and alternative penalties 1. In the case of an infringement of Article 1(5), Article 2(3) or Article 2a(2) which is not covered by Article 2d(1)(b), Member States shall provide for ineffectiveness in accordance with Article 2d(1) to (3), or for alternative penalties. Member States may provide that the review body independent of the contracting authority shall decide, after having assessed all relevant aspects, whether the contract should be considered ineffective or whether alternative penalties should be imposed.2. Alternative penalties must be effective, proportionate and dissuasive. Alternative penalties shall be:
Member States may confer on the review body broad discretion to take into account all the relevant factors, including the seriousness of the infringement, the behaviour of the contracting authority and, in the cases referred to in Article 2d(2), the extent to which the contract remains in force. The award of damages does not constitute an appropriate penalty for the purposes of this paragraph. Article 2 - f Time limits 1. Member States may provide that the application for review in accordance with Article 2d(1) must be made:
2. In all other cases, including applications for a review in accordance with Article 2e(1), the time limits for the application for a review shall be determined by national law, subject to the provisions of Article 2c.’; |
3. | Article 3 shall be replaced by the following: ‘Article 3 Corrective mechanism 1. The Commission may invoke the procedure provided for in paragraphs 2 to 5 when, prior to a contract being concluded, it considers that a serious infringement of Community law in the field of public procurement has been committed during a contract award procedure falling within the scope of Directive 2004/18/EC. 2. The Commission shall notify the Member State concerned of the reasons which have led it to conclude that a serious infringement has been committed and request its correction by appropriate means. 3. Within 21 calendar days of receipt of the notification referred to in paragraph 2, the Member State concerned shall communicate to the Commission:
4. A reasoned submission communicated pursuant to paragraph 3(b) may rely among other matters on the fact that the alleged infringement is already the subject of judicial or other review proceedings or of a review as referred to in Article 2(9). In such a case, the Member State shall inform the Commission of the result of those proceedings as soon as it becomes known. 5. Where notice has been given that a contract award procedure has been suspended in accordance with paragraph 3(c), the Member State shall notify the Commission when the suspension is lifted or another contract procedure relating in whole or in part to the same subject matter is begun. That notification shall confirm that the alleged infringement has been corrected or include a reasoned submission as to why no correction has been made.’; |
4. | the following articles shall be inserted: ‘Article 3a Content of a notice for voluntary ex ante transparency The notice referred to in the second indent of Article 2d(4), the format of which shall be adopted by the Commission in accordance with the advisory procedure referred to in Article 3b(2), shall contain the following information:
Article 3 - b Committee procedure2. Where reference is made to this paragraph, Articles 3 and 7 of Council Decision 1999/468/EC of 28 June 1999 laying down the procedures for the exercise of implementing powers conferred on the Commission (12) shall apply, having regard to the provisions of Article 8 thereof. |
5. | Article 4 shall be replaced by the following: ‘Article 4 Implementation 1. The Commission may request the Member States, in consultation with the Committee, to provide it with information on the operation of national review procedures. 2. Member States shall communicate to the Commission on an annual basis the text of all decisions, together with the reasons therefor, taken by their review bodies in accordance with Article 2d(3).’; |
6. | the following article shall be inserted: ‘Article 4a Review No later than 20 December 2012, the Commission shall review the implementation of this Directive and report to the European Parliament and to the Council on its effectiveness, and in particular on the effectiveness of the alternative penalties and time limits.’. |
Article 2 - Amendments to Directive 92/13/EEC
Directive 92/13/EEC is hereby amended as follows:1. | Article 1 shall be replaced by the following: ‘Article 1 Scope and availability of review procedures 1. This Directive applies to contracts referred to in Directive 2004/17/EC of the European Parliament and of the Council of 31 March 2004 coordinating the procurement procedures of entities operating in the water, energy, transport and postal services sectors (13), unless such contracts are excluded in accordance with Article 5(2), Articles 18 to 26, Articles 29 and 30 or Article 62 of that Directive. Contracts within the meaning of this Directive include supply, works and service contracts, framework agreements and dynamic purchasing systems. Member States shall take the measures necessary to ensure that, as regards contracts falling within the scope of Directive 2004/17/EC, decisions taken by contracting entities may be reviewed effectively and, in particular, as rapidly as possible in accordance with the conditions set out in Articles 2 to 2f of this Directive, on the grounds that such decisions have infringed Community law in the field of procurement or national rules transposing that law. 2. Member States shall ensure that there is no discrimination between undertakings likely to make a claim in respect of harm in the context of a procedure for the award of a contract as a result of the distinction made by this Directive between national rules implementing Community law and other national rules. 3. Member States shall ensure that the review procedures are available, under detailed rules which the Member States may establish, at least to any person having or having had an interest in obtaining a particular contract and who has been or risks being harmed by an alleged infringement. 4. Member States may require that the person wishing to use a review procedure has notified the contracting entity of the alleged infringement and of his intention to seek review, provided that this does not affect the standstill period in accordance with Article 2a(2) or any other time limits for applying for review in accordance with Article 2c. 5. Member States may require that the person concerned first seek review with the contracting entity. In that case, Member States shall ensure that the submission of such an application for review results in immediate suspension of the possibility to conclude the contract. Member States shall decide on the appropriate means of communication, including fax or electronic means, to be used for the application for review provided for in the first subparagraph. The suspension referred to in the first subparagraph shall not end before the expiry of a period of at least 10 calendar days with effect from the day following the date on which the contracting entity has sent a reply if fax or electronic means are used, or, if other means of communication are used, before the expiry of a period of either at least 15 calendar days with effect from the day following the date on which the contracting entity has sent a reply or at least 10 calendar days with effect from the day following the date of the receipt of a reply. |
2. | Article 2 shall be amended as follows:
|
3. | the following articles shall be inserted: ‘Article 2a Standstill period 1. The Member States shall ensure that the persons referred to in Article 1(3) have sufficient time for effective review of the contract award decisions taken by contracting entities, by adopting the necessary provisions respecting the minimum conditions set out in paragraph 2 of this Article and in Article 2c. 2. A contract may not be concluded following the decision to award a contract falling within the scope of Directive 2004/17/EC before the expiry of a period of at least 10 calendar days with effect from the day following the date on which the contract award decision is sent to the tenderers and candidates concerned if fax or electronic means are used or, if other means of communication are used, before the expiry of a period of either at least 15 calendar days with effect from the day following the date on which the contract award decision is sent to the tenderers and candidates concerned or at least 10 calendar days with effect from the day following the date of the receipt of the contract award decision. Tenderers shall be deemed to be concerned if they have not yet been definitively excluded. An exclusion is definitive if it has been notified to the tenderers concerned and has either been considered lawful by an independent review body or can no longer be subject to a review procedure. Candidates shall be deemed to be concerned if the contracting entity has not made available information about the rejection of their application before the notification of the contract award decision to the tenderers concerned. The communication of the award decision to each tenderer and candidate concerned shall be accompanied by the following:
Article 2 - b Derogations from the standstill period Member States may provide that the periods referred to in Article 2a(2) of this Directive do not apply in the following cases:
If this derogation is invoked, Member States shall ensure that the contract is ineffective in accordance with Articles 2d and 2f of this Directive where:
Article 2 - c Time limits for applying for review Where a Member State provides that any application for review of a contracting entity's decision taken in the context of, or in relation to, a contract award procedure falling within the scope of Directive 2004/17/EC must be made before the expiry of a specified period, this period shall be at least 10 calendar days with effect from the day following the date on which the contracting entity's decision is sent to the tenderer or candidate if fax or electronic means are used or, if other means of communication are used, this period shall be either at least 15 calendar days with effect from the day following the date on which the contracting entity's decision is sent to the tenderer or candidate or at least 10 calendar days with effect from the day following the date of receipt of the contracting entity's decision. The communication of the contracting entity's decision to each tenderer or candidate shall be accompanied by a summary of the relevant reasons. In the case of an application for a review concerning decisions referred to in Article 2(1)(b) of this Directive that are not subject to a specific notification, the time period shall be at least 10 calendar days from the date of the publication of the decision concerned.Article 2 - d Ineffectiveness 1. Member States shall ensure that a contract is considered ineffective by a review body independent of the contracting entity or that its ineffectiveness is the result of a decision of such a review body in any of the following cases:
2. The consequences of a contract being considered ineffective shall be provided for by national law. National law may provide for the retroactive cancellation of all contractual obligations or limit the scope of the cancellation to those obligations which still have to be performed. In the latter case, Member States shall provide for the application of other penalties within the meaning of Article 2e(2). 3. Member States may provide that the review body independent of the contracting entity may not consider a contract ineffective, even though it has been awarded illegally on the grounds mentioned in paragraph 1, if the review body finds, after having examined all relevant aspects, that overriding reasons relating to a general interest require that the effects of the contract should be maintained. In this case, Member States shall provide for alternative penalties within the meaning of Article 2e(2), which shall be applied instead. Economic interests in the effectiveness of the contract may only be considered as overriding reasons if in exceptional circumstances ineffectiveness would lead to disproportionate consequences. However, economic interests directly linked to the contract concerned shall not constitute overriding reasons relating to a general interest. Economic interests directly linked to the contract include, inter alia, the costs resulting from the delay in the execution of the contract, the costs resulting from the launching of a new procurement procedure, the costs resulting from the change of the economic operator performing the contract and the costs of legal obligations resulting from the ineffectiveness. 4. The Member States shall provide that paragraph 1(a) of this Article does not apply where:
5. The Member States shall provide that paragraph 1(c) of this Article does not apply where:
Article 2 - e Infringements of this Directive and alternative penalties 1. In case of an infringement of Article 1(5), Article 2(3) or Article 2a(2) not covered by Article 2d(1)(b), Member States shall provide for ineffectiveness in accordance with Article 2d(1) to (3), or for alternative penalties. Member States may provide that the review body independent of the contracting entity shall decide, after having assessed all relevant aspects, whether the contract should be considered ineffective or whether alternative penalties should be imposed.2. Alternative penalties must be effective, proportionate and dissuasive. Alternative penalties shall be:
Member States may confer on the review body broad discretion to take into account all the relevant factors, including the seriousness of the infringement, the behaviour of the contracting entity and, in the cases referred to in Article 2d(2), the extent to which the contract remains in force. The award of damages does not constitute an appropriate penalty for the purposes of this paragraph. Article 2 - f Time limits 1. Member States may provide that the application for review in accordance with Article 2d(1) must be made:
2. In all other cases, including applications for a review in accordance with Article 2e(1), the time limits for the application for a review shall be determined by national law, subject to the provisions of Article 2c.’; |
4. | Articles 3 to 7 shall be replaced by the following: ‘Article 3a Content of a notice for voluntary ex ante transparency The notice referred to in the second indent of Article 2d(4), the format of which shall be adopted by the Commission in accordance with the advisory procedure referred to in Article 3b(2), shall contain the following information:
Article 3 - b Committee procedure 1. The Commission shall be assisted by the Advisory Committee for Public Contracts set up by Article 1 of Council Decision 71/306/EEC of 26 July 1971 (14) (hereinafter referred to as the Committee).2. Where reference is made to this paragraph, Articles 3 and 7 of Council Decision 1999/468/EC of 28 June 1999 laying down the procedures for the exercise of implementing powers conferred on the Commission (15) shall apply, having regard to the provisions of Article 8 thereof. |
5. | Article 8 shall be replaced by the following: ‘Article 8 Corrective mechanism 1. The Commission may invoke the procedure provided for in paragraphs 2 to 5 when, prior to a contract being concluded, it considers that a serious infringement of Community law in the field of procurement has been committed during a contract award procedure falling within the scope of Directive 2004/17/EC, or in relation to Article 27(a) of that Directive in the case of contracting entities to which that provision applies. 2. The Commission shall notify the Member State concerned of the reasons which have led it to conclude that a serious infringement has been committed and request its correction by appropriate means. 3. Within 21 calendar days of receipt of the notification referred to in paragraph 2, the Member State concerned shall communicate to the Commission:
4. A reasoned submission communicated pursuant to paragraph 3(b) may rely among other matters on the fact that the alleged infringement is already the subject of judicial review proceedings or of a review as referred to in Article 2(9). In such a case, the Member State shall inform the Commission of the result of those proceedings as soon as it becomes known. 5. Where notice has been given that a contract award procedure has been suspended in accordance with paragraph 3(c), the Member State concerned shall notify the Commission when the suspension is lifted or another contract procedure relating in whole or in part to the same subject matter is begun. That new notification shall confirm that the alleged infringement has been corrected or include a reasoned submission as to why no correction has been made.’; |
6. | Articles 9 to 12 shall be replaced by the following: ‘Article 12 Implementation 1. The Commission may request the Member States, in consultation with the Committee, to provide it with information on the operation of national review procedures. 2. Member States shall communicate to the Commission on an annual basis the text of all decisions, together with the reasons therefor, taken by their review bodies in accordance with Article 2d(3). Article 12 - a Review No later than 20 December 2012, the Commission shall review the implementation of this Directive and report to the European Parliament and to the Council on its effectiveness, and in particular on the effectiveness of the alternative penalties and time limits.’; |
7. | the Annex shall be deleted. |
Article 3 - Transposition
1. Member States shall bring into force the laws, regulations and administrative provisions necessary to comply with this Directive by 20 December 2009. They shall forthwith communicate to the Commission the text of those provisions.When Member States adopt those measures, they shall contain a reference to this Directive or shall be accompanied by such reference on the occasion of their official publication. The Member States shall determine how such reference is to be made.
2. Member States shall communicate to the Commission the text of the main provisions of national law which they adopt in the field covered by this Directive.